 Summary of Bid Evaluation Reports

Public body Procurement ref Procurement description Details
District Council of Pamplemousses. The Supply, Laying and Compacting of Asphaltic Concrete The Supply, Laying and Compacting of Asphaltic Concrete. ONB 01 2018 - Resurfacing of roads - BEC - Executive Summary.pdf
Central Electricity Board OAB-TD-4180 Procurement of Medium Voltage Insulated Twisted Cables Exe.Summ of Bid Eval. Report OAB-TD-4180.pdf
Prime Minister's Office( National Developement Unit) NDU/Q/68/2017-2018/ONB Construction of Drains in Terre Rouge (Near Resto de Famille) Executive Summary of Bid Evaluation Report (resto de famille) (1).pdf
Mauritius Ports Authority MPA 353/2017 Consultancy Services for the Breakwater Structures & Land Reclamation Works at Fort William 353-2017 Executive Summary Breakwater.doc
Mauritius Ports Authority MPA/340/2017 High Security Fencing at Terminal II, MCT, Les Salines & HRB 340-2017 Bid Executive Summary-High Security Fencing-Rev 1.doc
Beach Authority BA/OAB/01/2018/19 Design and built of solar lighting system on public beaches Executive Summary.pdf
MINISTRY OF SOCIAL SECURITY, NATIONAL SOLIDARITY, AND ENVIRONMENT AND SUSTAINABLE DEVELOPMENT (ENVIRONMENT AND SUSTAINABLE DEVELOPMENT DIVISION) ENV/SWM/OAB/01/2018-2019 Procurement of Services for Cleaning and Maintenance of Toilet Blocks on Public Beaches for Lot No. 5 and Lot No. 6 Executive Summary Lot 5 and Lot 6.pdf
Central Electricity Board RB-TD-4175-Proc of Switch Fuse Disconnector RB-TD-4175-Proc of Switch Fuse Disconnector OAB-IT-4191-Executive Summary A.pdf
MINISTRY OF SOCIAL SECURITY, NATIONAL SOLIDARITY, AND ENVIRONMENT AND SUSTAINABLE DEVELOPMENT (ENVIRONMENT AND SUSTAINABLE DEVELOPMENT DIVISION) CPB/24/2018 Consultancy Services for the Design and Preparation of Bidding Documents for Vertical Expansion Works, Leachate Treatment Plant and other measures for increasing Disposal Capacity at the Mare Chicose Landfill and Supervision of Works & Operations Executive Summary for Consultancy services for vertical expansion woks at Mare Chicose Landfill - CPB 24 18.pdf
Road Development Authority CPB/79/2017 Design-Build/Turnkey and Completion of the Construction of A1-A3 Link Road - CPB/79/2017 Summary A1-A3.pdf
Mauritius Ports Authority MPA 401/2018 Procurement of Fire Fighting Vehicle Bid Executive Summary-Fire Fighting Vehicle.docx
Rodrigues Regional Assembly RRA/PI/04/2018-2019 Construction of a Stall Block including of Meat Shop in reinforced concrete column with a metal roof structure and covering of a total build up area of approximate 130m2 Executive Summary - New Market at Grand La Fouche Corail.pdf
Rodrigues Regional Assembly RRA/PI/04/2018-2019 Construction of a Stall Block including of Meat Shop in reinforced concrete column with a metal roof structure and covering of a total build up area of approximate 130m2 Executive Summary - New Market at Grand La Fouche Corail.pdf
Rodrigues Regional Assembly RRA/PI/04/2018-2019 Construction of a Stall Block including of Meat Shop in reinforced concrete column with a metal roof structure and covering of a total build up area of approximate 130m2 Executive Summary - New Market at Grand La Fouche Corail.pdf
Prime Minister's Office( National Developement Unit) NDU/Q/22/2018-2019/ONB CONSTRUCTION OF DRAINS IN BANGLADESH NETWORK ALONG GASTON MARTIN, TRANQUEBAR Procurement Reference: NDU/Q/22/2018-2019/ONB Exc Sum Const of Drains in Bangladesh Network along Gaston Martin, Tranquebar.pdf
Police Department OAB 12 of 2018-19 Construction of New Police Station at Grande Montagne Rodrigues Executive Summary G.Montagne.pdf
Police Department IFB 2018-111-OAB 2 of 2018-19 Procurement of Ready Made Shirts Exe. Sum Ready Made Shirt IFB 2018- 111.pdf
District Council of Pamplemousses. CPB/20/2018 Design and Build of an Administrative Building for the District Council of Pamplemousses - CPB/20/2018 Executive Summary of Bid Evaluation Report.pdf
Beach Authority BA/OAB/18/2018/19 Upgrading of Toilet Blocks on Public Beaches (BA/OAB/18/2018/19) Executive Summary OAB 18.pdf
Municipal Council of Beau Bassin / Rose Hill MBBRH/ONB03/2018-2019 The Municipal Council of Beau Bassin Rose Hill is inviting bids from eligible and qualified bidders for the Procurement of Street Cleaning, Refuse Collection and Disposal Services, Including Carting Away of Post Cyclonic Waste. Executive Summary-CPB-53-2018.pdf
Prime Minister's Office( National Developement Unit) CPB/48/2018 EXTENSION OF LINING WORKS AT CANAL KITCHRY, TRANQUEBAR Executive Summary - Canal Kitchry 04 .02.2019.docx
Ministry of Public Insfracture (PI Division) MPI OAB 01 of 2018 2019 Framework Agreement for Maintenance Refurbishment of Electrical Works in Government Buildings 2018 2019 Executive Summary.pdf
National Housing Development Company Ltd CPB/44/2018 Rehabilitation of Existing Wastewater Network and Ancillary Works on NHDC Housing Estates – Lot 1 Exe_Sum_CPB_44_2018.pdf
MINISTRY OF SOCIAL SECURITY, NATIONAL SOLIDARITY, AND ENVIRONMENT AND SUSTAINABLE DEVELOPMENT (ENVIRONMENT AND SUSTAINABLE DEVELOPMENT DIVISION) ENV/SWM/OAB/06/2018-2019 Recycling of E-wastes Executive Summary- Recycling of E-wastes.pdf
Beach Authority BA/OAB/33/2018/19 Construction of a New Parking Area and a new Toilet Block at Riambel Public Beach (BA/OAB/33/2018/19) Executive Summary OAB 18-19.pdf
Ministry of Education and Human Resources, Tertiary Education and Scientific Research MOEHRTESR/ Works/ONB 154/2017-18 Construction Works at Baichoo Madhoo Government School at Belle Rose EXECUTIVE SUMMARY ONB 154 2017-18.pdf
Prime Minister's Office( National Developement Unit) NDU/Q/21/2018-2019/ONB. Upgrading of Footbridge at Pont Rouge, Riviere du Poste - NDU/Q/21/2018-2019/ONB. Executive Summary Bid Evaluation Report - Camp du Roi Site.pdf
Ministry of Health and Quality of Life MHPQ/NP/MDIS/GLUCOSE/17-18/Q206 PROCUREMENT OF GLUCOSEMETERS AND TEST STRIPS FOR DETERMINATION OF GLUCOSE IN BLOOD Executive Summary of Bid Evaluation Report Q206 MDISP Glucosemeters and test strips 1.pdf
Mauritius Ports Authority MPA 395/2018 Dry Docking Works of Tug Da Patten Bid Executive Summary-MPA395-2018-1.docx
Mauritius Revenue Authority MRA/OABHCISERVER/06/18 Procurement of Hyper-Converged Infrastructure (HCI) Servers Executive Summary_HCI Server 11042019.pdf
Road Development Authority W/RDA/16/09-18 Construction of La Croisette/Grand Baie Link Road (W/RDA/16/09-18) Exesum la croisette.pdf
Government Printing Office CPB REF: CPB/33/2018 ; Procurement Ref No: PRG/PROC/50/2017-18 Construction of a new building for Government Printing Department at La Tour Koenig Pte Aux Sables Executive Summary of Bid Evaluation Report.docx for new Building for Govt Printing Department.pdf
MINISTRY OF SOCIAL SECURITY, NATIONAL SOLIDARITY, AND ENVIRONMENT AND SUSTAINABLE DEVELOPMENT (ENVIRONMENT AND SUSTAINABLE DEVELOPMENT DIVISION) ENV/SWM/OAB/09/2018-2019 Cleaning of Public Beaches - Lot 2 (Poste Lafayette to Providence) Executive Summary -Cleaning of P. Beaches-Lot 2.pdf
Airports of Mauritius Co Ltd OAB/GD/SS/VR/RD/18/007/Fire Rescue Boat - (14 November) Supply, Delivery and Commissioning of Fire Rescue Boat Executive Summary of BER - Fire Rescue Boat.pdf
Airports of Mauritius Co Ltd OAB/WK/ICT/RD/18/005/CAMPUS NETWORK(2MAY) Design, Build and Commissioning of AML Airport Campus Network Executive Summary of BER - Campus Network.pdf
Road Development Authority CPB/47/2018 Construction of an Interchange at Hillcrest across Motorway M1 (Design-Build/Turnkey) Hillcrest - Summary.pdf
National Housing Development Company Ltd CPB/63/2018 Construction of 282 Housing Units and Associated Infrastructure Works at Wooton. Exe_sum_cpb_63_2018.pdf
Ministry of Education and Human Resources, Tertiary Education and Scientific Research MOEHRTESR/ONB 076/2018-19 Supply and commissioning of personal computers Executive Summary Personal Computers ONB 076.pdf
Road Development Authority W/RDA/32/02-18 Improvement of Bend at Nouvelle Decouverte exesum bend.pdf
Wastewater Management Authority WMA-OAB-WW406W IFB 30-18 Construction of New WMA Office Construction of New WMA Office at Curepipe EXECUTIVE SUMMARY WMA-OAB-WW406W Construction of WMA Office at Curepipe.pdf
Ministry of Agro-Industry and Food Security MOAIFS/Q465/2019-19/OAB Provision of Security Services Executive Summary of Bid Evaluation Report(template).docx
Ministry of Local Government & Outer Islands CPB/62/2018 Supply, testing and commissioning of Compactor and Tipper lorries. Executive Summary of Bid Evaluation Report.pdf
Ministry of Local Government & Outer Islands CPB/66/2018 Supply, testing and commissioning of backhoe loaders and lorries mounted with crane. Executive Summary CPB 66-2018.pdf
Wastewater Management Authority OIP-CPB-06-2016 WMA Contract WW260W Construction of Trunk Sewers, Reticulation Network, House Connections and CWA Pipe Replacement - Contract WW260W Pailles Guibies Sewerage Project Phase 2 Executive summary WW260W Pailles Guibies Sewerage Project.pdf
Mauritius Ports Authority MPA 417/2019 Procurement of Light Diesel Oil (Gas Oil) under Framework Agreement Executive Bid Summary.pdf
Municipal Council of Beau Bassin / Rose Hill ONB10/MBBRH/2018/2019 The Municipal Council of Beau Bassin Rose Hill is inviting bids from eligible and qualified contractors for the construction of a reinforced concrete Ground Floor Multipurpose complex building and yard at Camp Levieux near Geranium Complex (NHDC) Executive Summary Multicomplex at Geranium.pdf
Financial Services Commission Proc/EAS/2019-01 Provision of External Audit Services at the Financial Services Commission, Mauritius Executive summary of bid evaluation report - Provision of external audit service.pdf
Ministry of Health and Quality of Life MHPQ/NP/MDSP/DCKITS/2018-2019/Q189 CPB/19/2019 PROCUREMENT OF DIALYSIS CONSUMABLES KITS (FOR YEARS 2019-2021) Executive Summary of BEC Dialysis Consumables Kits (2).pdf
District Council of Grand Port Notice for ONBW005-2018-CPB37/2018,ONBW006/2018, ONBW007/2018-2019, ONBW008/2018-2019 DCGP/ONB/W005-2018,CPB/37/2018 Cons of Fair at Mahebourg DCGP/ONB/W006/2018 - Cons of Incinerator at Mahebourg DCGP/ONB/W007/208-2019 - Resurfacing of Roads for Yr 2018-19 DCGP/ONB/W008/2018-2019 - Cons of Other Roads for Yr 2018-19 Executive Summary Bid Evaluation Report 02.09.19.pdf
District Council of Grand Port Notice for ONBW005-2018-CPB37/2018,ONBW006/2018, ONBW007/2018-2019, ONBW008/2018-2019 DCGP/ONB/W005-2018,CPB/37/2018 Cons of Fair at Mahebourg DCGP/ONB/W006/2018 - Cons of Incinerator at Mahebourg DCGP/ONB/W007/208-2019 - Resurfacing of Roads for Yr 2018-19 DCGP/ONB/W008/2018-2019 - Cons of Other Roads for Yr 2018-19 Executive Summary Bid Evaluation Report Construction of New Fair at Mahebourg 02.09.19.pdf
Mauritius Ports Authority MPA 405/2018 Construction of a Cruise Terminal Building at Port Louis Harbour Bid Executive Summary- Cruise Terminal1.pdf
Wastewater Management Authority WMA-OAB-WW424W IFB 15-19 Upgrading of sewer line along Nehru Street Phoenix Upgrading of sewer line along J.Nehru Street, Phoenix Phase II (from Junction Edgar Quirin to Junction S. Hossen/A10 Road) Executive Summary Contract WW424W J Nehru Street.pdf
Wastewater Management Authority WW389W IFB 11-18 Sewerage Project at Valentina Phoenix Sewerage Project at Valentina Phoenix Executive Summary Contract WW389W Valentina Phoenix.pdf
Mauritius Ports Authority MPA 427-2019 REPAIRS AND MAINTENANCE WORKS TO PORT INFRASTRUCTURE - (TERMINALS I, II & III) (MPA 427-2019-Repairs and Maintenance To Port Infrastructure).docx
Rodrigues Regional Assembly RRA/EDU/OAB /21/2018/2019 UPGRADING WORKS AT BASILE ALLAS PORT-MATHURIN GOVERNMENT SCHOOL: - FENCING AND UPGRADING OF PLAYGROUND AND CONSTRUCTION OF PREAU CUM MULTIPURPOSE HALL AND UPGRADING WORKS AT PRE-PRIMARY SCHOOL ebs-upgrading of Basile Allas - Copy2.pdf
Rodrigues Regional Assembly RRA/EDU/OAB /21/2018/2019 UPGRADING WORKS AT BASILE ALLAS PORT-MATHURIN GOVERNMENT SCHOOL: - FENCING AND UPGRADING OF PLAYGROUND AND CONSTRUCTION OF PREAU CUM MULTIPURPOSE HALL AND UPGRADING WORKS AT PRE-PRIMARY SCHOOL ebs-upgrading of Basile Allas - Copy2.pdf
Rodrigues Regional Assembly RRA/EDU/OAB /21/2018/2019 UPGRADING WORKS AT BASILE ALLAS PORT-MATHURIN GOVERNMENT SCHOOL: - FENCING AND UPGRADING OF PLAYGROUND AND CONSTRUCTION OF PREAU CUM MULTIPURPOSE HALL AND UPGRADING WORKS AT PRE-PRIMARY SCHOOL ebs-upgrading of Basile Allas - Copy2.pdf
Ministry of Health and Quality of Life CPB/30/2019 CONSTRUCTION OF MEDICLINIC AT BEL AIR EXECUTIVE SUMMARY BEL AIR.pdf
Beach Authority (BA/OAB/01/2019-20) Provision of solar lighting system on public beaches (BA/OAB/01/2019-20) Executive Summary Solar lighting BA-OAB-01-2019-20.pdf
Ministry of Health and Quality of Life MHPQ/NP/WKS&S/MEDROSEHILL/2018-2019/Q231 FT, CPB/27/2019 CONSTRUCTION OF MEDICLINIC AT STANLEY, ROSE HILL EXECUTIVE SUMMARY STANLEY.pdf
Registrar-General’s Department RGD/45/1/2019-2020/OAB SUPPLY, INSTALLATION, CONFIGURATION AND COMMISSIONING OF IT EQUIPMENT Bid Summarry report_09.10.19.doc
Central Electricity Board OAB-TD-4271 Design, Manufacture, Supply, Installation, Testing and Commissioning of 1.5MW Battery Energy Storage Systems for Rodrigues Island TD4271 Executive Summary.pdf
 
 